Entanglement |
|||
How we made it |
|||
| Installation Schema | |||
![]() ![]() |
|||
| Installation Needs for One Site *please be noted that this is a telematic project and there will be two installations at two sites. |
|||
Wall Structure (for current design. The wall design can change to be site-specific.)
Internet
|
|||
| Work Schedule | |||
Varies by sites condition / Approximately 5-7 days (each 2 days for installation at each site, 1-3 days for network and sound test) |
|||